1
/
of
9
PetLoc8
Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)
Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (Subscription Required)
Regular price
$41.17 USD
Regular price
$41.17 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans.
- NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywhere. iOS & Android app.
- ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.
- SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.
- LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.
Overview
- Brand : PETLOC8
- Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
- Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
- Included Components : Collar Mount, User Manual, GPS tracker, Charging Cable
- Item Weight : 1.06 Ounces
Share
