Skip to product information
1 of 9

PetLoc8

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

Regular price $41.17 USD
Regular price $41.17 USD Sale price
Shipping calculated at checkout.

About This

  • This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans.
  • Real-Time GPS Tracker works anywhere with a 4G SIM, keeping your dog safe — know their exact location anytime through the Petloc8 app. iOS & Android.
  • Collar-compatible, lightweight & waterproof design (IP67) makes it perfect for daily adventures — rain or shine. Ideal for active dogs or escape artists, this is perfect for hiking, traveling, and everyday walks, thanks to its long-life battery that works up to 14 days on one charge.
  • Smart alerts and custom Geo-Fence zones notify you instantly if your pet wanders too far.
  • Built-in pet owner community lets family & friends monitor your dog’s safety too — free and instant.

Overview

  • Brand : PETLOC8
  • Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
  • Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
  • Supported Application : Petloc8 app, iOS, Android
  • Material : Plastic, Rubber
View full details